Our Work
Browse some of our recent projects
01
Ship Loader alignment
Mechanical engineering survey to monitor the deflection of key structural points during the cable tension process
02
Clinker storage structure
Initial topographical survey for earthworks design, followed by bulk earthwork setout, pile setout and finally holding-down bolt setout.
03
Detention basin design
Hydrographic surveys of numerous detention basis to establish a baseline volume. Design larger detention structures to accommodate 1 in 100 year flood events, while minimising the amount of earthworks.
04
Silo construction
Survey every stage of the construction process. Piling setout, footing setout, shutter setout, verticality monitoring at each collar movement and finally an as constructed model of the entire silo, conveyors and walkways.